Åkvarteren, Lomma HamnHighly Commended CEEQUAL Outstanding Achievement Award 2013 for Land Use |
|
Whole Project Award
Project Team
Client: Skanska
Nya Hem
Design: Tyréns,
Sydväst, Sweco
Construction: Skanska
Sverige AB, Väg och Anläggning Syd
The Project
Åkvarteren is a 25,000 m2 regeneration project to create
a residential development in a former industrial landscape
at Lomma Harbour. The site is situated on an area historically
reclaimed from the sea using dredging and other fill materials.
This in combination with the past industrial activities resulted
in a site that needed to be cleaned up before becoming a suitable
place for people to live.
The project is a turnkey contract with Skanska Residential
Development (client) and Skanska Civil, Southern Region (contractor).
The works comprise the demolition of old industrial buildings,
paved surfaces, remediation to treat contamination, new water
and sewage systems, construction of new access routes, foundation
works for houses to be built, and landscape paving and planting.
The project started in 2007 and two (of three) sections were
completed and occupied by the end of 2011.
Skanska Sweden carried out a CEEQUAL Whole Project Award
to assess how well environmental and social aspects have been
dealt with throughout the project by all parties involved.
Another aim was for the Skanska team to understand the CEEQUAL
process, how this could be applied to other projects in the
future and what benefits it could bring to our clients.
Challenges
The project scored well in both the Land Use and Waste Management sections. This is largely a result of the extensive remediation work carried out to make the site suitable for residential development and the high proportion of materials that were recycled for reuse in the project.
As a pilot scheme, one of the main aims was to understand
the current level of environmental performance and identify
areas that could be improved. One of the main benefits of
using CEEQUAL was the external verification of evidence which
gives a level of confidence to the client that social and
environmental issues area properly addressed.
Measures
Examples of measures taken;
- 100% reuse of sand, tarmac, bricks and concrete within the project.
- 75% reuse of excavated materials within the project.
- Preservation of existing willow trees along the river
promenade.